DOES THE BUILDING NEED TO SIT ON GRAVEL OR CONCRETE?

The only requirement is a level location. Our buildings are designed to rest directly on their skids. In order to level, we use a jack to raise the building until it is level, then we block underneath it with ground contact rated treated wood blocks.